ICF New Build In Droitwich
ICF New Build With Insulated Raft Slab
- Date: May 2022
- Project Type: ICF New Build
About this Project
This is a brand new ICF build in Droitwich and has been built using an insulated raft slab for extra thermal efficiency.
![PHOTO-2022-09-22-20-32-14](http://basementhomes.co.uk/wp-content/uploads/2022/09/PHOTO-2022-09-22-20-32-14.jpg)
ICF New Build With Insulated Raft Slab
This is a brand new ICF build in Droitwich and has been built using an insulated raft slab for extra thermal efficiency.